Large Load Customer Service combines seasonal electricity supply, bundled generation and transmission demand, and recovery riders. The forecast represents constant, firm imports equal to contract capacity.

Service overview

Item Coverage
Service Missouri · MISO · Schedule 11(M), Standard transmission service.
Rate basis ET-2025-0184 compliance rates effective January 4, 2026; sheets 61.5–61.9. Ameren Missouri filed general rate case ER-2026-0291 on June 26, 2026; new rates can take effect from June 1, 2027. The forecast does not reflect that case.
Supply Bundled utility service, forecast using seasonal energy prices and a class-cost demand forecast.

Charge breakdown

Line item / what it pays for Tariff Charge Type How the Charge Is Assessed Calculation basis
Electricity supply Supply Energy Imported MWh multiplied by seasonal energy rate.
Generation and transmission demand Supply Capacity (demand-based) Monthly peak imported MW multiplied by seasonal demand rate.
Fuel adjustment Rider Energy Imported MWh multiplied by fuel-adjustment rate.
Securitized cost recovery Rider Energy Imported MWh multiplied by annual recovery rate.
Customer service Distribution Fixed Monthly customer amount.
Low-income support Rider Fixed Monthly support amount.

How charges are calculated

Energy

The energy rate is 90% of the annual seasonal average day-ahead price, before the renewable rider. Summer covers June–September; the remaining months form the other season. A full season’s prices determine the rate, even for a shorter forecast period.

Energy cost is calculated by multiplying imported MWh by 90% of the seasonal average price in $/MWh and applying the 1.033 multiplier.

Demand and recovery riders

Monthly peak imports are multiplied by a seasonal demand rate that includes generation and transmission costs. Fuel adjustment and securitization are separate per-MWh charges. Customer service and low-income support are fixed monthly charges.

Renewable rider assumption

A 3.3% renewable rider is applied once to each of the six included charges. This is a forecast assumption; the filed 2026 rider uses a per-kWh rate.

Forecast methodology

Charge How its rate changes
Energy 90% of each year’s seasonal average day-ahead price. One forecast rate applies within each season.
Demand Seasonal filed rates are increased for allocated MISO transmission additions and for generation additions from the 2023 Integrated Resource Plan as revised by the February 2025 preferred-plan change, net of amounts already in base rates or recovered through fuel adjustment. Class demand and revenue grow with the LRZ5 peak-load index and planning price index. The 2026 Integrated Resource Plan filed in September 2026 is not yet reflected in the published cost inputs.
Fuel adjustment A base fuel rate plus the allocated share of eligible transmission costs, with customer sharing and load growth.
Securitization Uses the supplied annual recovery schedule in real 2025 dollars.
Customer and low-income support Assumed 4.3% annual nominal growth from 2026, followed by inflation conversion.
Renewable rider 3.3% applied to all six charges throughout the forecast.

Assumptions and limitations

Assumption Effect on results
Demand rule Monthly maximum imports approximate the Standard tariff only for constant imports at contract capacity. Variable loads require the on/off-peak rule, 80% contract floor, and alternate-rate eligibility.
Revenue allocation New transmission and generation cost is recovered across the rate class by an equal-percentage increase. The demand share of class revenue is held at 44.89%, from the ER-2024-0319 stipulation, assuming proportional growth in other base revenue. The ET-2025-0184 stipulation requires Ameren Missouri to propose cost-causation allocation for large load customers at the first general rate case with a customer of 75 MW or more in the test year; the equal-percentage rule applies until that case.
Energy efficiency Assumes the large-customer opt-out.
Taxes Taxes are excluded. Missouri state sales tax is 4.225%, with local sales tax added where applicable. A qualifying new data storage center approved under RSMo 144.810 can receive state and local sales-tax exemptions on electricity for up to fifteen years, subject to the program’s limits. Municipal gross receipts taxes are separate and may still apply under the tariff’s Tax Adjustment clause.
Excluded charges Reactive-power charges below 90% lagging power factor and the Cost Stabilization Rider are excluded. The rider is zero unless a discount has been negotiated.
Partial months Monthly demand and fixed charges are not prorated by day. Use complete billing months when comparing with invoices.

Public tariffs and regulatory filings

Source Coverage
LLCS tariff filing Schedule 11(M), sheets 61.5–61.9.
ER-2024-0319 Staff rate design testimony Class allocators: transmission 8.28%, production 7.35%, energy 11.64%.
ER-2024-0319 Stipulation and Agreement Exhibit A: class revenue by rate element; source of the 44.89% demand share.
ER-2026-0291 case record Pending general rate case filed June 26, 2026. Search File No. ER-2026-0291.
Missouri data storage center tax exemption Eligibility, covered utilities, exemption limits, and duration.

Methodology version: October 2026. Results use real 2025 dollars.